Solar installation License Requirements in Memphis, TN
Last reviewed: July 2026
Quick Answer
Solar installers in Memphis, Tennessee must obtain an Electrical Contractor License from the Tennessee Board of Licensing for Contractors and Electricians (BLCE). You also need electrical permits from the City of Memphis, building permits from Memphis and Shelby County, and a utility interconnection approval from Memphis Light, Gas and Water (MLGW). Most solar installation businesses operate as licensed electrical contractors and must carry liability insurance and surety bonding.
Key Facts
- •Tennessee requires solar installers to hold an electrical license from the Board of Licensing for Contractors and Electricians.
- •Memphis requires solar permits, electrical permits, and building permits before installation work begins.
- •Federal solar tax credits (ITC) require proper licensing and documentation for customer eligibility.
- •Solar installers must comply with the National Electrical Code and Tennessee electrical standards.
- •Liability insurance and bonding are essential for solar installation businesses in Memphis.
State Licence Requirements
Licence name
Electrical Contractor License
Issued by
Tennessee Board of Licensing for Contractors and Electricians (BLCE)
Cost
$200-$450
Processing time
4-8 weeks after exam completion
How to apply
To obtain an Electrical Contractor License in Tennessee for solar installation work, you must first pass the Electrical Contractor examination administered by the BLCE. The application process requires proof of at least four years of electrical construction experience (1,500 hours per year minimum) or equivalent education. You can apply at the BLCE website (https://www.tn.gov/commerce/trec/licensing.html) or submit Form TREC-50 in person at the BLCE office in Nashville.
Required documentation includes copies of your electrician's license, proof of apprenticeship completion or work experience, high school diploma or GED, and identification documents. You must register with the Tennessee Secretary of State and obtain an EIN from the IRS before applying for the contractor license. The application fee is approximately $200-$300. After submitting your application, you will receive notice of your examination date. The Electrical Contractor exam covers the National Electrical Code (NEC), Tennessee electrical regulations, business practices, and safety standards specific to solar installations under Article 690 of the NEC.
Once you pass the examination, the BLCE will issue your license within 1-2 weeks. Your license must be displayed at your principal place of business and on all vehicles. You are required to maintain a registered office address in Tennessee and carry general liability insurance of at least $300,000. Per Tennessee Code Annotated § 62-6-102, your license allows you to perform solar installations and supervise apprentices. You must renew your license every three years and complete at least 24 hours of continuing education during each license period, with at least 8 hours in electrical safety and code updates.
Federal Requirements
Solar installation businesses must comply with multiple federal requirements. First, obtain an Employer Identification Number (EIN) from the Internal Revenue Service under 26 U.S.C. § 501(c), even if you are a sole proprietor. Solar installers must ensure all installations meet the National Electrical Code (NEC) standards, particularly Article 690 which covers solar photovoltaic systems. The Federal Trade Commission (FTC) enforces truth in advertising regulations (16 CFR Part 429) that apply to solar sales and marketing.
For customer financing and solar leasing arrangements, compliance with the Truth in Lending Act (15 U.S.C. § 1601 et seq.) and Regulation Z (12 CFR Part 1026) is mandatory. If your business manufactures or distributes solar equipment, the Department of Energy oversees compliance with efficiency standards under the Energy Policy Act. The Environmental Protection Agency (EPA) may have jurisdiction if your installation involves proper disposal of old roofing materials or electrical components under the Resource Conservation and Recovery Act (42 U.S.C. § 6901).
All solar installers must maintain OSHA compliance for workplace safety (29 U.S.C. § 651) and ensure electricians meet occupational health and safety standards. If you employ workers, you must withhold income taxes and pay employment taxes under 26 U.S.C. § 1 and § 3101. The federal solar Investment Tax Credit (ITC) under 26 U.S.C. § 48 allows customers to claim 30% of installation costs, but only if installations are performed by licensed contractors—this creates federal incentive for maintaining proper licensing.
Local & County Requirements
Memphis and Shelby County impose multiple local requirements for solar installation work. The City of Memphis requires an Electrical Permit from the Division of Code Enforcement before any solar installation begins. Submit the electrical permit application (Form E-1) to the Code Enforcement office with a detailed site plan, electrical schematic showing interconnection to MLGW systems, and proof of your electrical contractor license. The electrical permit fee ranges from $150-$300 depending on system size.
A Building Permit is required from the Memphis Division of Engineering and Planning Services for roof-mounted solar installations. This involves structural review of your roof to ensure it can support the solar array weight. Provide engineering drawings, load calculations, and proof of insurance. The building permit typically costs $200-$400. For ground-mounted systems, you may need zoning approval from the Memphis Planning Commission to ensure the installation complies with setback and height restrictions.
Shelby County requires a separate permit if your installation is outside Memphis city limits. The Shelby County Engineering Department reviews structural plans and environmental impacts. Fire Marshal approval is required in both Memphis and Shelby County, as solar installations must meet fire code requirements under the International Fire Code. This typically takes 1-2 weeks for review.
Utility interconnection approval from Memphis Light, Gas and Water (MLGW) is mandatory before activation. MLGW requires an Interconnection Agreement and system specifications documenting how the solar system connects to the grid. This process typically takes 2-4 weeks. Some neighborhoods or historic districts in Memphis require Design Review Board approval, particularly if the installation is visible from the street. The Memphis Planning Commission maintains a list of historic districts. Finally, if you operate from a commercial location, you need Occupancy and Use approval from Code Enforcement confirming your office space is zoned for contractor operations.
Total Cost Breakdown
The first-year cost of starting a solar installation business in Memphis, Tennessee includes multiple components. The Electrical Contractor License from BLCE costs $200-$300 for the initial application and examination fee. You will need general liability insurance, which ranges from $500-$1,500 annually for a solo operator, with amounts increasing based on revenue projections and coverage limits ($300,000 minimum required).
Local permits for your first installation project include: Electrical Permit ($150-$300), Building Permit ($200-$400), Fire Marshal approval (typically included in building permit), and utility interconnection application fee ($0-$50 depending on MLGW). If operating from a commercial office, Occupancy and Use permit costs $100-$250. These local permits total approximately $450-$1,000 per project.
Business registration costs include Tennessee Secretary of State registration ($100-$150) and EIN registration with the IRS (free). If you form an LLC or corporation, filing fees range from $100-$300. Memphis business tax licensing costs $25-$75. You should budget $300-$500 for continuing education courses (24 hours required, typically $10-$25 per hour).
Surety bonding is strongly recommended and costs $300-$800 annually depending on bonding company and coverage amount ($10,000-$25,000 typical for startup). Vehicle signage and branding showing your license number costs $200-$400. Office setup and initial marketing typically range from $500-$1,500. A realistic first-year total cost range is $3,000-$6,500 including licensing, permits, insurance, bonding, business registration, and initial operational expenses. Subsequent years will be lower (approximately $1,500-$2,500) as you only pay renewal fees and continuing education rather than initial licensing costs.
Licence Renewal
Your Electrical Contractor License in Tennessee must be renewed every three years on the anniversary of your issuance date. The BLCE will send renewal notices 60 days before your license expires. To renew, you must complete at least 24 hours of approved continuing education during the three-year period immediately preceding renewal, with a minimum of 8 hours in electrical safety and code updates and 4 hours in business/management topics. The remaining 12 hours can be taken in topics relevant to solar installation, such as renewable energy systems, energy storage, electrical distribution, or advanced solar technologies.
Continuing education must be completed through BLCE-approved providers. Courses can be taken in-person or online. The BLCE maintains an approved provider list on its website at https://www.tn.gov/commerce/trec/licensing.html. Renewal fees are approximately $200-$300. You must submit proof of continuing education completion with your renewal application, which can be done online through the BLCE portal or by mail. If you miss the renewal deadline, your license becomes inactive, and you cannot legally perform electrical work or solar installations in Tennessee. To reactivate, you must pay a late renewal fee (typically $50-$100 additional) and submit proof of continuing education for the period your license was inactive. If your license has been inactive for more than 12 months, you may need to retake the entire examination. Licenses can be renewed up to 90 days before expiration, allowing you to maintain continuous coverage.
Penalties for Operating Without a Licence
Operating as a solar installer in Memphis without a valid Electrical Contractor License is a serious violation under Tennessee Code Annotated § 62-6-305. Penalties include civil fines up to $1,000 per violation per day of non-compliance. Criminal penalties apply if you misrepresent your license status or fraudulently claim to be a licensed contractor—this is a Class B misdemeanor punishable by up to six months in jail and fines up to $500.
The Tennessee Board of Licensing for Contractors and Electricians (BLCE) actively investigates unlicensed solar installations through complaints, utility interconnection applications, and permit records. When BLCE discovers unlicensed work, it issues a Cease and Desist order requiring immediate work stoppage. Violation of a Cease and Desist order results in additional fines of up to $2,500 per day. Customers can sue unlicensed contractors for breach of contract and recover damages. Insurance claims filed by customers for faulty solar installations by unlicensed contractors may be denied because the work was illegal.
Membership in the Memphis Construction Board of Appeals does not protect unlicensed installers. The City of Memphis code enforcement can impose additional municipal penalties of up to $500 per day for unpermitted solar installation work under Memphis City Code § 25-2-121. Unpermitted installations void the building permit system and may prevent sale of the property. Electric utility Memphis Light, Gas and Water (MLGW) can refuse to interconnect systems installed by unlicensed contractors, rendering the system non-functional and worthless. Unlicensed work also exposes you to personal liability claims if injuries occur, as you cannot carry workers' compensation insurance legally without proper licensing. Customers injured during defective solar installations can sue you personally and attach your personal assets, since unlicensed contractors cannot be covered by contractor liability insurance.
Compare solar installation insurance quotes from top-rated providers specializing in contractor liability coverage.
Get notified when licensing rules change
Licensing requirements and fees change periodically. We'll email you when this page is updated.
Frequently Asked Questions
How long does it take to get licensed as a solar installer in Memphis from start to finish?
The complete process typically takes 8-12 weeks. First, you must accumulate four years of electrical experience (or complete an apprenticeship) before you are eligible—this is a prerequisite that may take 4-8 years if you don't already have it. Once eligible, registration with Tennessee Secretary of State takes 1-2 weeks. The BLCE exam application review takes 2-3 weeks, after which you receive your exam date. The actual Electrical Contractor exam takes 4 hours and is offered regularly. After passing, the BLCE issues your license within 1-2 weeks. For your first solar project, add 2-4 weeks for local permits (electrical, building, utility interconnection). If you already have electrical experience or a journeyman electrician license, the process is accelerated to 4-8 weeks for state licensure plus 2-4 weeks for initial project permits.
Do I need separate permits from Memphis city and Shelby County?
Yes, the requirements depend on your installation location. If the solar installation is within Memphis city limits, you need permits from the City of Memphis Division of Code Enforcement (electrical permit), Division of Engineering and Planning Services (building permit), and fire marshal approval. If your installation is in unincorporated Shelby County (outside Memphis city limits), you need permits from Shelby County Engineering Department instead. Some areas of Shelby County may require both city and county permits depending on jurisdiction boundaries. You must determine your exact location's jurisdiction before applying. Memphis Light, Gas and Water (MLGW) utility interconnection approval is required regardless of location within their service territory. If your installation is in a historic district (primarily downtown Memphis and the Cooper-Young neighborhood), you also need Memphis Planning Commission Design Review Board approval, which adds 2-3 weeks to the timeline.
What happens if I start solar installations without getting my Electrical Contractor License first?
Operating without a license is illegal and carries serious consequences. You face civil penalties of up to $1,000 per day of violation from the BLCE. The Tennessee Board will issue a Cease and Desist order forcing you to stop work immediately—violating this order adds $2,500 per day in additional fines. Criminal charges can be filed if you misrepresent your credentials, constituting a Class B misdemeanor with up to six months jail time and $500 in criminal fines. Customers can sue you for breach of contract and recover damages. Unpermitted installations void property title, preventing customer resale. Most importantly, you cannot legally carry liability or workers' compensation insurance as an unlicensed contractor, exposing your personal assets to lawsuits if anyone is injured or property is damaged. MLGW will refuse to interconnect systems installed by unlicensed contractors, rendering your installations non-functional. Banks and solar financing companies will not fund installations by unlicensed contractors, eliminating your customer base. The federal solar tax credit (ITC) that your customers rely on requires installation by licensed contractors—unlicensed work disqualifies customers from claiming the 30% federal tax credit, destroying your sales pitch and customer relationships.
Can I get licensed in another state and work in Memphis without Tennessee licensure?
No. Tennessee does not offer reciprocal licensing with other states. Even if you hold an Electrical Contractor License in California, Florida, Arizona, or any other state, you cannot legally perform solar installations in Memphis or anywhere in Tennessee without a Tennessee Electrical Contractor License. You must complete the full Tennessee licensing process, including passing the Tennessee Electrical Contractor examination that covers Tennessee-specific codes and the National Electrical Code. Your out-of-state experience counts toward the four-year experience requirement, but you must still pass the Tennessee exam. Some credits toward continuing education from other states may be accepted, but the BLCE makes case-by-case determinations. If you are a licensed electrician or contractor in another state, contact the BLCE directly at https://www.tn.gov/commerce/trec/licensing.html to learn whether your experience accelerates the Tennessee application timeline. Do not attempt to work in Memphis with an out-of-state license—you will face the same penalties as an unlicensed contractor, including cease-and-desist orders, fines, and customer lawsuits.
What is the cost of Memphis local permits for a typical residential solar installation?
A typical residential solar installation (4-6 kW system) will require approximately $450-$1,000 in local permits. The Memphis Electrical Permit costs $150-$300 depending on system size and complexity. The Building Permit for roof-mounted systems costs $200-$400 and includes structural review. Fire Marshal approval is typically included in the building permit. If you need separate zoning review for ground-mounted systems, that adds $50-$150. Memphis Light, Gas and Water (MLGW) utility interconnection processing is typically free but may include a small application fee ($0-$50). If the property is in a historic district, Design Review Board approval adds 2-3 weeks but may not include an additional fee beyond standard permits. Shelby County permits (if outside Memphis) cost similarly: $150-$300 for electrical, $200-$400 for building. Plan for $600-$800 total for a typical residential project in Memphis, plus $150-$250 for commercial or industrial systems. Always confirm current fee schedules with the Memphis Division of Code Enforcement at (901) 636-6401 before quoting customers, as permit fees change annually.
Other Business Types in Memphis, TN
solar installation business Licensing in Other States
See solar installation business licensing in every state →Sources & References
- Tennessee Code Annotated § 62-6-102 — Defines electrical contractor license requirements and classifications
- Tennessee Code Annotated § 62-6-112 — Establishes examination and competency requirements for electrical licenses
- Memphis City Code § 25-8-262 — Requires electrical permits for solar installation work
- 26 U.S.C. § 48(a)(5) — Federal solar Investment Tax Credit eligibility requirements
- National Electrical Code Article 690 — Standards for interconnected electric power production sources
Licence requirements change. Verify current requirements with the issuing agency before applying.
Editorial standards: This guide is reviewed against primary government sources and cites 5 statutes. Last reviewed July 2026. Scheduled for re-verification by July 2027.
See our editorial policy for how content is created and verified, or report an inaccuracy.