Skip to main content

General contractor License Requirements in Memphis, TN

Last reviewed: July 2026

Quick Answer

Yes, you need a Tennessee General Contractor License issued by the Tennessee Construction Contractors Licensing Board (TCCLB). The license requires passing the NASCLA exam, proving four years of work experience (or equivalent education), and maintaining a $25,000 surety bond. Memphis contractors must also register with the City of Memphis Building and Code Enforcement Division and obtain local permits for each project.

Key Facts

  • Tennessee requires general contractors to obtain a license from the Tennessee Construction Contractors Licensing Board.
  • Applicants must pass the NASCLA contractor exam and provide proof of experience or education.
  • License renewal is required every two years with continuing education hours.
  • Memphis contractors must also obtain local permits and comply with city zoning requirements.
  • Operating without a license can result in fines up to $1,000 and cease-and-desist orders.

State Licence Requirements

Licence name

Tennessee General Contractor License

Issued by

Tennessee Construction Contractors Licensing Board (TCCLB)

Cost

$450-$650

Processing time

4-6 weeks

How to apply

To obtain a Tennessee General Contractor License, submit an application to the TCCLB through their official website (https://www.tn.gov/commerce/tradeandeconomicdevelopment/tcclb.html). The application requires proof of four years of active construction experience in the classification you're seeking, or an equivalent combination of education (bachelor's degree in construction or engineering) and experience. You must provide detailed work history with references, a high school diploma or GED, and proof of a $25,000 surety bond.

Next, register for and pass the NASCLA Contractor Exam, which costs approximately $150-$200. The exam covers Tennessee contractor law, business practices, safety regulations, and construction knowledge specific to your classification. Once your application is approved and exam passed, submit proof of workers' compensation insurance and general liability insurance (minimum $100,000 coverage). Pay the license fee ($450-$650 depending on classification) and your license is issued, valid for two years from issuance. Tennessee Code Annotated § 62-6-102 and § 62-6-110 establish these requirements. Initial processing typically takes 4-6 weeks after all documents are submitted.

Federal Requirements

General contractors in Memphis must comply with several federal requirements regardless of state licensing. You must obtain an Employer Identification Number (EIN) from the IRS (26 U.S.C. § 1402), even if you operate as a sole proprietor, to report federal income taxes and employment taxes. If you hire employees, you must comply with the Fair Labor Standards Act (29 U.S.C. § 201 et seq.) regarding minimum wage, overtime, and record-keeping.

OSHA regulations (29 U.S.C. § 651 et seq.) apply to all construction work, requiring you to maintain safe job sites, provide safety equipment, and report serious injuries. If your projects involve federal funding or are federally subsidized, you must comply with prevailing wage requirements and Davis-Bacon Act provisions (40 U.S.C. § 3141 et seq.). The Americans with Disabilities Act (42 U.S.C. § 12101 et seq.) requires all public-facing business operations and employee work areas to be accessible.

If you handle hazardous materials or conduct demolition, EPA regulations (40 U.S.C. § 6901 et seq.) and lead-based paint rules (15 U.S.C. § 2681 et seq.) may apply. For projects involving water pollution or wetlands, Clean Water Act compliance (33 U.S.C. § 1251 et seq.) is mandatory. You must also maintain workers' compensation insurance as required by Tennessee law and carry general liability insurance to protect against third-party claims.

Local & County Requirements

Memphis contractors must comply with additional local requirements beyond state licensing. Register with the City of Memphis Building and Code Enforcement Division and obtain a local contractor business license, which costs approximately $100-$200 annually. Before starting any project, you must obtain a building permit from the Memphis Building and Code Enforcement Division, with costs ranging from $150-$500+ depending on project scope and estimated construction value.

Most projects in Memphis require a certificate of occupancy inspection upon completion. You may need separate permits for electrical, plumbing, mechanical, and HVAC work, especially for larger projects—these often require licensed subcontractors holding their own specialty licenses. Zoning compliance is mandatory; verify that your project location and use comply with Memphis zoning ordinances by contacting the Department of Planning and Development. If your work involves demolition, hazardous materials removal, or changes to historic structures, additional permits and inspections apply.

Fire safety inspections are required for commercial projects, handled by the Memphis Fire Department. Shelby County may have additional requirements for projects outside Memphis city limits. Always contact the specific city/county building department for the jurisdiction where you'll work, as requirements vary significantly by location and project type within the Memphis area.

Total Cost Breakdown

First-year costs for becoming a licensed general contractor in Memphis include multiple required expenses. The Tennessee General Contractor License itself costs $450-$650 depending on your classification and experience. The NASCLA Exam registration and testing fee is approximately $150-$200. You must obtain a $25,000 surety bond, which costs $200-$400 annually depending on your credit and experience. Workers' compensation insurance is mandatory if you hire employees; expect $800-$2,500 for initial premium depending on payroll (you'll need proof for license application). General Liability Insurance (minimum $100,000 coverage) costs $600-$1,500 for initial annual premium.

Mempis local business license registration costs $100-$200. Your first building permit for a project varies significantly by scope—budget $150-$500 as an example. If you need subcontractor or specialty licenses (electrical, plumbing, HVAC), each adds $150-$400. Continuing education courses required at renewal cost $200-$400 total, though you only pay this every two years. Legal and accounting setup costs (business formation, bookkeeping software, accounting consultation) typically run $300-$600.

Total estimated first-year startup cost ranges from $3,500-$6,500, depending on whether you hire employees immediately, your experience level (affecting bond rates and exam difficulty), and your initial project scope. This assumes modest insurance coverage and one major permit. Larger operations with multiple employees or commercial-focused work should budget $7,000-$9,000 for comprehensive coverage and compliance infrastructure.

Licence Renewal

Tennessee General Contractor Licenses must be renewed every two years on a schedule determined by your license issue date. You will receive renewal notice approximately 90 days before expiration. The renewal fee is $450-$650 (same as initial license cost). To renew, you must complete 16 continuing education hours from approved providers—eight hours in contractor law and two hours in safety, with the remaining six hours in construction-related topics. You can complete continuing education through online courses, in-person classes, or webinars offered by TCCLB-approved organizations.

You must maintain proof of current workers' compensation insurance and general liability insurance (minimum $100,000). Renewal applications are submitted online through the TCCLB website at https://www.tn.gov/commerce/tradeandeconomicdevelopment/tcclb.html. Late renewal penalties apply if you miss the deadline; failure to renew by the expiration date results in license suspension and possible legal action. Your license cannot perform work if expired. Renewal can be completed entirely online, and processing typically takes 2-3 weeks. Plan to complete continuing education at least 60 days before expiration to allow time for course completion and processing.

Penalties for Operating Without a Licence

Operating as a general contractor in Tennessee without a valid license violates Tennessee Code Annotated § 62-6-114 and constitutes illegal practice. Violations result in civil penalties of $100-$1,000 per offense, with each day of unlicensed operation constituting a separate violation. Criminal penalties include potential jail time up to 11 months, 29 days, and fines up to $2,500 for willful violations. The TCCLB and City of Memphis Building Department actively discover unlicensed contractors through complaint investigations, permit reviews, job site inspections, and public record checks.

The city and state can issue cease-and-desist orders immediately upon discovering unlicensed operation, requiring work stoppage and project completion only by a licensed contractor at the unlicensed operator's expense. Homeowners can recover damages in civil court against unlicensed contractors for substandard work. Insurance companies may deny liability claims if you're operating without a license, leaving you personally liable for injuries or property damage. Unlicensed contractors cannot recover payment for work performed—clients can refuse to pay and face no legal consequences. Licensing Board investigations result in permanent records affecting future licensing eligibility. Additionally, unlicensed operation may expose you to local fines under Memphis city ordinances, typically $50-$500 per violation.

Compare affordable contractor insurance quotes from top-rated providers serving Memphis and Tennessee.

Get notified when licensing rules change

Licensing requirements and fees change periodically. We'll email you when this page is updated.

Frequently Asked Questions

How long does it take to get a general contractor license in Memphis?

The total timeline from application to receiving your Tennessee General Contractor License typically ranges from 6-10 weeks. This breaks down as follows: application review by TCCLB takes 2-3 weeks, NASCLA exam scheduling and testing can be completed within 2-4 weeks of application submission, and final processing after exam passage and bond/insurance documentation takes another 2-3 weeks. However, this assumes you have all required documentation ready when you apply—delays in gathering your four years of work experience documentation, references, or insurance quotes can extend the timeline to 12-16 weeks. Many contractors apply 2-3 months before their planned project start date to allow for unexpected delays. Once your license is issued, you can begin working immediately, though you still need project-specific permits from the City of Memphis, which add another 1-2 weeks per project.

Do I need a separate Memphis city license if I have a Tennessee state contractor license?

Yes, you need both. The Tennessee state General Contractor License from the TCCLB allows you to legally practice construction contracting in Tennessee statewide, but the City of Memphis requires an additional local business license ($100-$200 annually) registered with the Memphis Building and Code Enforcement Division. This is a separate document from your state license and is specific to operating within Memphis city limits. If you work in unincorporated Shelby County (outside Memphis proper), you may need different or additional registration. For each specific project in Memphis, you also need a building permit from the city, which is distinct from both your state license and local business license. Think of it this way: the state license proves you're qualified to do construction work, the city business license proves you're registered to do business in Memphis, and the building permit authorizes that specific project. All three are legally required.

Can I transfer my general contractor license from another state to Tennessee?

Tennessee does not have a formal reciprocity agreement for general contractor licenses from other states. If you hold a license in another state, you must apply for a new Tennessee license through the standard process, including passing the NASCLA Contractor Exam specific to Tennessee requirements. However, your out-of-state work experience counts toward Tennessee's four-year experience requirement—you don't need to restart your experience clock. You should document your out-of-state work history thoroughly with dated references and project descriptions to prove equivalent experience. When you apply, clearly indicate your prior state license number and provide copies of that license and any continuing education certificates. Some applicants with extensive out-of-state experience may qualify for testing exemptions or expedited processing, but this must be approved individually by the TCCLB. Contact the TCCLB at their website (https://www.tn.gov/commerce/tradeandeconomicdevelopment/tcclb.html) with your specific situation before applying, as expedited pathways are rare and require TCCLB discretion.

What happens if I start working as a contractor before my license is approved?

Operating without a valid Tennessee General Contractor License is illegal under Tennessee Code Annotated § 62-6-114 and constitutes a serious violation with severe consequences. Even if your application is pending and you believe it will be approved, you cannot legally perform contractor work or enter into contracts for construction services. Doing so exposes you to fines of $100-$1,000 per violation, with each day of unlicensed work counting as a separate violation—meaning a 30-day project could result in $3,000-$30,000 in fines. The TCCLB can issue cease-and-desist orders stopping your work immediately. Any customer can refuse to pay you entirely, and you have no legal right to recover those payments for unlicensed work. Your general liability insurance will likely deny claims because you were operating illegally. In serious cases involving fraud or deception, criminal charges with jail time up to 11 months and 29 days are possible. Additionally, being caught operating without a license severely damages your future licensing prospects—the violation becomes a permanent public record reviewed when you eventually apply. Always wait for official written license approval before accepting any paid contractor work.

What if I only do small home repair projects—do I still need a license?

Yes, you need a Tennessee General Contractor License to legally perform any construction work for compensation in Memphis, regardless of project size. Tennessee law defines a contractor as anyone who contracts to construct, repair, remodel, or alter buildings, and this applies to small repairs and home maintenance work just as much as major construction projects. The distinction between 'general contractor' and 'handyman' is legally important: if you're charging for the work, you need the license. Some very limited exceptions exist for certain minor work (like small painting or basic repairs under $100), but these are narrow and rarely apply in practice. Many homeowners mistakenly hire unlicensed workers for 'small jobs' and both parties face liability—you for operating illegally and the homeowner for potentially violating building codes. Even small projects must comply with Memphis building codes and may require permits depending on scope. Licensed contractors have lower insurance liability and legal protection. The smart approach is to obtain your license before taking any paid work, regardless of project size—the license pays for itself in just one or two projects.

Other Business Types in Memphis, TN

general contractor Licensing in Other States

See general contractor licensing in every state →

Sources & References

  • Tennessee Code Annotated § 62-6-102Establishes contractor licensing requirements and TCCLB authority
  • Tennessee Code Annotated § 62-6-110Defines licensed contractor qualifications and experience requirements
  • Tennessee Code Annotated § 62-6-114Specifies penalties for operating without a license
  • Tennessee Code Annotated § 62-6-108Details license renewal requirements and continuing education

Licence requirements change. Verify current requirements with the issuing agency before applying.

Editorial standards: This guide is reviewed against primary government sources and cites 4 statutes. Last reviewed July 2026. Scheduled for re-verification by July 2027.

See our editorial policy for how content is created and verified, or report an inaccuracy.