Preschool License Requirements in Minneapolis, MN
Last reviewed: July 2026
Quick Answer
Yes, Minnesota requires a License to Operate from the Minnesota Department of Human Services (DHS) for all preschools serving more than four unrelated children. The licensing process includes facility inspections, background checks for all staff, and compliance with childcare rules. Applications are submitted to DHS, and processing typically takes 4–8 weeks after inspection. Minneapolis also requires a city zoning permit and building permit before DHS licensure can proceed.
Key Facts
- •Minnesota requires preschools to obtain a license from the Department of Human Services.
- •Licensing includes facility inspections, staff background checks, and health/safety compliance.
- •Unlicensed preschools operating in Minneapolis face substantial fines and legal action.
- •Initial licensing costs range from $500–$1,500 plus ongoing compliance expenses.
- •Minneapolis has additional zoning and building permits required before DHS licensure.
State Licence Requirements
Licence name
License to Operate (Child Care Facility)
Issued by
Minnesota Department of Human Services (DHS), Licensing Division
Cost
$500–$1,500
Processing time
4–8 weeks after facility inspection
How to apply
To obtain a License to Operate in Minnesota, you must first complete pre-licensure requirements before submitting to the DHS Licensing Division. Step 1: Secure your facility location and verify it meets zoning requirements with the City of Minneapolis Planning and Zoning Department. Step 2: Obtain a Minneapolis zoning permit and building permit from the Minneapolis Permitting and Compliance Department. Step 3: Ensure your facility meets DHS minimum standards, including space requirements (35 square feet per child indoors, safe outdoor play area), health and safety equipment (first aid kits, fire extinguishers, emergency exits), and staff qualifications.
Step 4: Complete background checks for all staff, including Minnesota state criminal background checks, FBI background checks, and checks with the Minnesota Department of Human Services maltreatment registry. Step 5: Download the DHS child care licensing application from the Minnesota DHS website (https://www.dhs.state.mn.us) and submit it with required documentation, including proof of facility ownership, building permits, staff qualifications, health inspection certificates, and proof of liability insurance. Step 6: DHS schedules a facility inspection to verify compliance with Minnesota Rules § 9503.0010–9503.0170, which covers staffing ratios, training requirements, nutrition, health, and safety standards.
Step 7: Ensure all staff have current CPR and first aid certifications from an American Heart Association-approved provider. Step 8: Complete mandatory training in child abuse and neglect recognition under Minnesota Statutes § 245A.05. Step 9: Once the inspection passes and all documentation is approved, DHS issues your License to Operate. The entire process, from application submission to licensure, typically takes 4–8 weeks after a successful facility inspection. You cannot legally operate until you receive your license.
Federal Requirements
Federal requirements for Minnesota preschools include IRS Employer Identification Number (EIN) under 26 U.S.C. § 501(a) if operating as a nonprofit or any entity with employees. Preschools must comply with the Americans with Disabilities Act (ADA) under 42 U.S.C. §§ 12101–12213, ensuring physical accessibility and reasonable accommodations for children with disabilities. Federal child nutrition programs, such as the Child and Adult Care Food Program (CACFP) under 42 U.S.C. § 1766, may apply if the preschool serves meals.
Occupational Safety and Health Administration (OSHA) standards under 29 U.S.C. § 651 et seq. apply to preschool workplaces, including requirements for safe equipment, emergency protocols, and hazard communication. Preschools must comply with the Family Educational Rights and Privacy Act (FERPA) under 20 U.S.C. § 1232g regarding student records confidentiality. If the preschool receives federal funding or operates as a nonprofit, additional compliance with the OMB Uniform Guidance (2 C.F.R. Part 200) may be required.
All preschools must ensure employees pass FBI background checks and comply with state and federal child abuse registry checks. Federal tax withholding requirements under 26 U.S.C. § 3101 apply to all staff members. Lead paint inspection compliance under 42 U.S.C. § 4852d applies to facilities built before 1978. CPR and first aid certifications, while state-mandated in Minnesota, align with federal guidelines for childcare safety standards.
Local & County Requirements
Minneapolis preschools must comply with multiple local permitting and zoning requirements in addition to state licensing. First, you must obtain a Zoning Permit from the Minneapolis Planning and Zoning Department to verify your facility location is in a zone that permits childcare operations. Residential zones typically allow home-based preschools with limitations on enrollment; commercial zones have fewer restrictions but higher rents. You must also secure a Building Permit from the Minneapolis Permitting and Compliance Department before opening, confirming that your facility meets all building codes, including fire-rated exits, electrical safety, and structural integrity.
Minneapolis requires a Health Inspection Certificate from the Minneapolis Health Department before licensing, ensuring potable water, proper sanitation, food storage, and hazard-free conditions. Fire Safety Inspections are conducted by the Minneapolis Fire Department to verify working smoke detectors, carbon monoxide detectors, fire extinguishers, clearly marked emergency exits, and evacuation procedures. If your facility serves food, a Food Service License from the Minneapolis Health Department is required, following Minnesota Health Department food safety rules. Some Minneapolis neighborhoods may have additional deed restrictions or homeowner association rules that prohibit commercial childcare operations, so review your property deed and HOA covenants.
Minneapolis also enforces signage permits if you plan to display an exterior business sign. Parking and traffic flow requirements apply if your preschool is in a commercial area. Lead-based paint disclosure and inspection is required for facilities in buildings constructed before 1978 under federal law. Requirements vary significantly by neighborhood and facility type, so contact the City of Minneapolis Permitting and Compliance Department at (311) for specific requirements for your address.
Total Cost Breakdown
The total first-year cost to open a licensed preschool in Minneapolis ranges from $8,000–$25,000, depending on facility size, location, and existing infrastructure. Start with the Minnesota DHS License to Operate application and inspection fee of $500–$1,500. Minneapolis Zoning Permit costs $200–$500, and a Building Permit ranges from $300–$1,000 based on facility square footage and construction scope. Health Inspection Certification from the Minneapolis Health Department costs $150–$300, and a Fire Safety Inspection costs $200–$400.
If serving food, a Minneapolis Food Service License costs $100–$300. Liability insurance, required by DHS and highly recommended, costs $1,500–$3,500 annually for a small preschool. CPR and first aid certifications for all staff (assuming 3–5 staff members) cost approximately $300–$600 total. Background check processing for all staff members costs $100–$300 combined. Mandatory child abuse and neglect training costs $50–$150 for initial compliance.
Security deposit for a leased facility typically equals one month's rent ($2,000–$5,000 for a typical preschool space in Minneapolis). Initial equipment, furniture, toys, and educational materials cost $3,000–$8,000. First month's facility rent or mortgage costs $2,000–$5,000. Initial staffing and payroll for opening (two weeks) costs $1,500–$4,000. Contingency and miscellaneous costs add $500–$1,000. Total estimated first-year startup cost: $12,500–$32,000, with ongoing annual operational costs of $30,000–$80,000 depending on enrollment, staff size, and facility location.
Licence Renewal
Minnesota preschool licenses expire annually and must be renewed by December 31 of each year. Renewal applications must be submitted to the Minnesota DHS Licensing Division at least 60 days before expiration to allow time for processing. The renewal fee is typically $200–$400 annually, though costs may vary based on facility size and capacity. During renewal, all staff must maintain current CPR and first aid certifications, and at least one staff member must complete 16 hours of continuing education in childcare-related topics, such as child development, safety training, or mental health.
Directors and managers must complete additional professional development hours as specified in Minnesota Statutes § 245A.05. DHS may conduct a renewal inspection to verify ongoing compliance with facility standards, health and safety requirements, and staffing ratios. If you miss the renewal deadline, your license expires and you must immediately cease childcare operations. Operating with an expired license violates Minnesota Statutes § 245A.11 and results in fines of up to $3,000 per day and potential criminal charges. Renewal applications can be submitted online through the DHS portal or by mail. You will receive a renewal notice 90 days before expiration. Late fees apply if renewal is submitted after the deadline.
Penalties for Operating Without a Licence
Operating a preschool without a valid Minnesota license is a serious violation under Minnesota Statutes § 245A.11. Any individual or entity providing childcare to more than four unrelated children without a License to Operate faces civil penalties of up to $3,000 per day of unlicensed operation. These penalties accumulate quickly; operating for even one week without a license could result in fines exceeding $20,000. Criminal penalties apply for willful violations, including misdemeanor charges punishable by up to 90 days in jail and/or fines up to $1,000, or gross misdemeanor charges for repeat offenses with penalties up to one year in jail and fines up to $3,000.
The Minnesota DHS Licensing Division can issue a cease-and-desist order requiring immediate closure of the unlicensed preschool. DHS can discover unlicensed operations through parent complaints, neighbor reports, or proactive investigations. Local law enforcement and the Minneapolis Police Department can also investigate and enforce licensing violations. Operating unlicensed exposes the operator to civil liability if a child is injured, as liability insurance obtained without valid licensing may be voided. Unlicensed preschools cannot access state childcare subsidy programs, significantly limiting enrollment and revenue.
Parents using unlicensed preschools may be ineligible for tax credits or dependent care subsidies. Background checks and criminal history disclosures are not conducted for unlicensed facilities, creating serious safety risks. DHS can also pursue administrative enforcement, denying future licensing applications for up to five years following an unlicensed operation violation. Facilities with substantiated child maltreatment, health code violations, or safety hazards face additional enforcement and potential criminal charges under Minnesota childcare safety statutes.
Explore Minnesota-specific business formation services and compliance tools to streamline your preschool licensing process.
Get notified when licensing rules change
Licensing requirements and fees change periodically. We'll email you when this page is updated.
Frequently Asked Questions
Do I need a license to operate a home-based preschool in Minneapolis?
Yes, Minnesota requires a License to Operate for any childcare facility serving more than four unrelated children, including home-based preschools. This applies whether you operate in your home or a commercial facility. The only exception is if you care for four or fewer unrelated children and are related by blood or marriage to at least one child. Under Minnesota Statutes § 245A.02, home-based preschools must meet the same licensing standards as commercial facilities, including health and safety inspections, staff background checks, and CPR certification. Even if you operate in your own home, you must obtain Minneapolis zoning approval confirming that home-based childcare is permitted in your residential zone. Processing your license takes 4–8 weeks after inspection, so plan accordingly before your planned opening date.
How long does it take to get a preschool license in Minnesota?
The complete timeline from initial planning to receiving your License to Operate typically takes 12–20 weeks. Pre-licensure activities, including securing a facility location, obtaining city permits, and completing facility upgrades, usually require 4–10 weeks. Once you submit your DHS application with all required documentation, the Licensing Division reviews your submission and schedules a facility inspection within 2–4 weeks. The actual inspection typically takes one day. After inspection, if deficiencies are found, you have time to correct them before final approval, which can add 2–4 weeks. Once DHS confirms compliance and issues your license, you can legally begin operations. To minimize delays, start the permitting process and facility preparation immediately and submit your DHS application only after all pre-licensure requirements are complete, including passing the facility inspection.
What is the annual renewal process for a Minnesota preschool license?
Minnesota preschool licenses expire annually on December 31 and must be renewed each year to continue operating legally. Submit your renewal application to DHS at least 60 days before expiration (by November 1) to allow processing time. The annual renewal fee is $200–$400. During renewal, you must verify that all staff maintain current CPR and first aid certifications and have completed required continuing education—typically 16 hours annually for staff and additional hours for directors under Minnesota Statutes § 245A.05. DHS may conduct a renewal inspection to confirm ongoing compliance with facility standards, health codes, and staffing ratios. Online renewal through the DHS portal is available and is faster than mail submission. If you miss the December 31 deadline, your license expires immediately, and you must cease childcare operations until renewal is approved. Late renewal submissions may incur additional fees and enforcement action.
What happens if I operate a preschool without a Minnesota license?
Operating an unlicensed preschool is a serious violation of Minnesota law with severe consequences. Under Minnesota Statutes § 245A.11, operating without a license results in civil penalties of up to $3,000 per day of unlicensed operation. A single week of unlicensed operation can result in fines exceeding $20,000. Criminal misdemeanor charges apply for willful violations, punishable by up to 90 days in jail and/or fines up to $1,000. DHS can issue an immediate cease-and-desist order requiring you to close the facility and stop accepting children. Background checks and criminal history disclosures are not conducted for unlicensed facilities, creating serious safety risks for children. Liability insurance obtained without valid licensing may be voided, leaving you personally liable for any injuries or incidents. Parents using unlicensed preschools cannot claim dependent care tax credits or childcare subsidies. DHS can deny future licensing applications for up to five years following an unlicensed operation violation.
What are the specific Minneapolis zoning and building requirements for a preschool?
Minneapolis zoning regulations determine whether preschools are permitted in specific zones and under what conditions. Residential zones (R1–R4) typically allow home-based preschools with restrictions on enrollment, exterior signage, and parking. Commercial zones (C1–C3) and industrial zones generally permit preschools with fewer restrictions. You must obtain a Zoning Permit from the Minneapolis Planning and Zoning Department to verify your facility location is compliant. Building permits are required from the Minneapolis Permitting and Compliance Department, confirming that your facility meets fire codes, electrical safety standards, structural requirements, and accessibility guidelines. Your facility must have clearly marked emergency exits, functioning smoke detectors and carbon monoxide detectors, fire extinguishers, and an approved evacuation plan. If the building was constructed before 1978, lead-based paint inspection is required. Some Minneapolis neighborhoods have deed restrictions or HOA covenants that may prohibit childcare operations, so verify your property deed. Contact the City of Minneapolis Permitting and Compliance Department at (311) or visit their website for neighborhood-specific requirements.
Other Business Types in Minneapolis, MN
preschool Licensing in Other States
See preschool licensing in every state →Sources & References
- Minnesota Statutes § 245A.02 — Defines child care facility licensing requirements
- Minnesota Statutes § 245A.04 — Sets minimum standards for licensed child care facilities
- Minnesota Statutes § 245A.11 — Establishes penalties for operating unlicensed childcare
- Minnesota Rules § 9503.0010–9503.0170 — Details licensing standards and facility requirements
Licence requirements change. Verify current requirements with the issuing agency before applying.
Editorial standards: This guide is reviewed against primary government sources and cites 4 statutes. Last reviewed July 2026. Scheduled for re-verification by July 2027.
See our editorial policy for how content is created and verified, or report an inaccuracy.