Motel License Requirements in Glendale, AZ

Last reviewed: September 2026

Quick Answer

You need an Arizona State Lodging License issued by the Arizona Department of Health Services, plus a Glendale City Conditional Use Permit and Lodging Tax Registration from the Glendale Finance Department. The state license is mandatory for all motels under A.R.S. § 34-226. Glendale also requires zoning compliance, fire inspection clearance, and proof of local business registration. Processing typically takes 6–12 weeks total.

Key Facts

  • Arizona requires a State Lodging License for all motels (Arizona Revised Statutes § 34-226).
  • Glendale requires additional local lodging permits and zoning approval before state licensing.
  • Motels must comply with Arizona Department of Health Services standards and local fire codes.
  • Renewal occurs biennially; failure to license results in civil penalties up to $500 per day.
  • First-year costs typically range $1,200–$2,500 including state and local permits.

State Licence Requirements

Licence name

Arizona State Lodging License

Issued by

Arizona Department of Health Services, Office of Lodging

Cost

$400–$650

Processing time

6–10 weeks after local approval is obtained

How to apply

To obtain your Arizona State Lodging License, begin by submitting an application to the Arizona Department of Health Services Office of Lodging (https://health.arizona.gov/licensing). You must first obtain local approval from Glendale, including proof of zoning compliance and a Conditional Use Permit, which demonstrates your property meets local requirements.

Prepare the following documents: completed application form DHS 680 (obtainable from the ADHS website), proof of local approval from Glendale City, proof of workers' compensation insurance (required by A.R.S. § 34-227), property inspection report certifying compliance with Arizona health and safety standards (conducted by a third-party certified inspector), evidence of liability insurance with minimum $1 million coverage, and floor plans showing room layouts and facility configurations.

Submit all documents to the ADHS Office of Lodging by mail or through their online portal. An ADHS inspector will schedule a site inspection (typically 2–4 weeks after submission) to verify compliance with R9-3-217 sanitation standards, fire safety codes, emergency exits, linen storage, and guest amenity standards. The inspection focuses on cleanliness, structural integrity, working locks on guest rooms, adequate lighting, and emergency communication systems.

After passing inspection, pay the application and license fee ($400–$650 depending on property size and room count). Your State Lodging License is valid for two years from issuance. The entire process from local approval to state license issuance typically requires 6–10 weeks (A.R.S. § 34-229).

Federal Requirements

Federal requirements for motels include obtaining an Employer Identification Number (EIN) from the IRS (26 U.S.C. § 501) if you have employees or operate as a partnership or corporation. The Americans with Disabilities Act (42 U.S.C. § 12181 et seq.) applies to all motels; you must ensure public areas, guest rooms, and facilities are accessible to individuals with disabilities, including accessible parking, entrance ramps, accessible room configurations, and ADA-compliant signage.

The Fair Housing Act (42 U.S.C. § 3604) prohibits discrimination in housing accommodations based on race, color, religion, sex, national origin, disability, or familial status. You must maintain non-discriminatory policies and training for staff. If you have employees, you must comply with the Fair Labor Standards Act (29 U.S.C. § 201 et seq.) regarding minimum wage, overtime, and recordkeeping.

The Immigration Reform and Control Act (8 U.S.C. § 1324a) requires I-9 verification for all employees. Property records and guest registration must comply with federal anti-money laundering requirements under the Bank Secrecy Act (31 U.S.C. § 5318). If your motel serves alcohol, you need a federal beer and wine permit from the TTB (27 U.S.C. § 203 et seq.). Environmental compliance under the Clean Water Act (33 U.S.C. § 1251 et seq.) applies to wastewater management; consult with Arizona Department of Environmental Quality for specific requirements.

Local & County Requirements

Glendale imposes several mandatory local requirements before you can obtain state licensure. First, you must verify zoning compliance; motels are typically permitted in commercial or mixed-use zones under Glendale City Code § 4-2-1, but restricted in residential areas. Contact the Glendale Planning and Zoning Department (623-930-2635) to confirm your property zoning and whether a Conditional Use Permit (CUP) is required.

Most motels in Glendale require a Conditional Use Permit, which involves submitting site plans, architectural renderings, traffic impact analysis, and operational plans to the Planning Department. A public hearing before the Planning and Zoning Commission is mandatory; objections from nearby property owners can delay approval by 4–8 weeks. Once the CUP is approved, obtain a Local Business License from the Glendale Finance Department (cost: $75–$150).

Fire inspection is mandatory before state licensure. Contact Glendale Fire Department (623-930-3000) to schedule an inspection of fire exits, alarm systems, sprinklers, extinguishers, and emergency lighting. Building permits for any renovations or construction must be obtained from Glendale Development Services before work begins.

Glendale also requires Lodging Tax Registration with the Finance Department (no separate fee, but you must remit 5% lodging tax monthly). Sign and utility permits are required if you plan exterior signage. These local permits and inspections collectively take 8–12 weeks and must be completed before submitting your state application.

Total Cost Breakdown

Your first-year total cost to open and operate a motel in Glendale, AZ typically ranges from $1,200–$2,500, broken down as follows:

State Licensing: Arizona State Lodging License application and issuance fee is $400–$650 (cost varies by property size: small motels under 25 rooms pay $400; larger properties pay up to $650). This is a one-time initial fee; biennial renewal is the same amount.

Local Permits and Licenses: Glendale Conditional Use Permit application fee is $300–$500 (processing includes planning staff time and public hearing); Local Business License is $75–$150 annually; Fire Inspection fee (if charged separately by Glendale) is typically $100–$200. Zoning verification and sign permits: $50–$150 combined.

Other First-Year Costs: Workers' Compensation Insurance (mandatory, required by A.R.S. § 34-227) for a small motel with 5–10 employees costs approximately $3,000–$8,000 annually, depending on payroll and claims history. Liability Insurance (minimum $1 million coverage required) costs $1,500–$4,000 annually for a 20–40 room motel. Property inspection by certified inspector (required for state application): $200–$500. Building permits for renovations (if needed): $200–$600 depending on scope.

Total Estimated First-Year Cost: $1,200–$2,500 in licensing and permits alone; add $4,500–$12,000 for mandatory insurance (workers' compensation + liability). Realistic all-in first-year cost is $5,700–$14,500 before operational expenses. Year two and beyond: renew State Lodging License ($400–$650) and Local Business License ($75–$150) biennially, plus ongoing insurance premiums.

Licence Renewal

Your Arizona State Lodging License expires two years from the date of issuance and must be renewed on a biennial cycle. The renewal deadline is the last day of the month in which your license expires; failure to renew by this date constitutes operating without a valid license, subject to penalties under A.R.S. § 34-234. Renewal can be completed online through the ADHS portal (https://health.arizona.gov/licensing) starting 90 days before expiration.

To renew, submit the completed renewal application, proof of current workers' compensation insurance, proof of liability insurance (minimum $1 million), an updated inspection report (required every two years), and the renewal fee ($400–$650, same as initial licensing). If your property has undergone major renovations, room count changes, or modifications to guest amenities, a full re-inspection may be required.

Arizona does not mandate continuing education for motel operators, but the ADHS Office of Lodging provides optional training on health and safety compliance. Your Glendale Local Business License also requires renewal annually (renewal deadline: within 60 days of the expiration date; renewal cost: $75–$150).

If you miss the state renewal deadline, your license automatically becomes expired. You have a 30-day grace period to renew without additional penalties, but operating during this period is technically unlicensed. After 30 days, you face civil penalties of $100–$500 per day of non-compliance and potential cease-and-desist orders from ADHS (A.R.S. § 34-234). Online renewal submission typically processes within 2–3 weeks if all documents are complete; paper renewals may take 4–6 weeks.

Penalties for Operating Without a Licence

Operating a motel without a valid Arizona State Lodging License is a violation of A.R.S. § 34-234 and subjects you to substantial civil and criminal penalties. The primary civil penalty is $100–$500 per day of non-compliance; if you operate without a license for 30 days, penalties can accumulate to $3,000–$15,000. These penalties are imposed by ADHS through administrative citation and can be appealed, but the burden of proof is on the operator to demonstrate compliance.

Beyond daily fines, ADHS may issue a Cease and Desist Order, which mandates immediate closure of the motel and prohibition on accepting new guests. Violation of a Cease and Desist Order is a Class 2 misdemeanor (A.R.S. § 13-601), punishable by up to four months in jail and/or fines up to $750. Criminal prosecution is rare but possible if the unlicensed operation endangers guests through health and safety violations (e.g., operating without fire exits, unsanitary conditions).

Glendale enforces complementary local penalties under City Code § 4-2-30. Operating without a local Conditional Use Permit or Business License results in fines of $500–$2,500 per violation, plus mandatory closure orders. Violations discovered through guest complaints, anonymous tips, or routine inspections trigger investigation and citation within 10–15 days.

Insurance implications are severe: most liability insurers explicitly exclude coverage for unlicensed operations, meaning any injuries, property damage, or guest complaints are entirely your financial responsibility. Guests may pursue civil lawsuits for negligence without insurance protection. Additionally, unpaid lodging taxes due to unlicensed operation create separate penalties from Arizona Department of Revenue (5% tax plus interest and penalties up to 25% of unpaid taxes). Property mortgagees may also declare default if you operate illegally, jeopardizing ownership.

Get professional guidance on Arizona motel licensing and compliance—consult with a hospitality business attorney licensed in Arizona to expedite your approval process.

Get notified when licensing rules change

Licensing requirements and fees change periodically. We'll email you when this page is updated.

Frequently Asked Questions

How long does it take to open a motel in Glendale from start to finish?

The complete process typically takes 12–18 weeks. First, secure local zoning approval and a Conditional Use Permit from Glendale Planning Department (4–10 weeks, including public hearing if required). Simultaneously, arrange workers' compensation and liability insurance (1–2 weeks). Once you have local CUP approval, apply for your Arizona State Lodging License with ADHS (allow 4–6 weeks for application processing and inspection scheduling). After the ADHS site inspection passes (2–4 weeks), you receive your state license. Parallel processes—fire inspection, building permits, business registration—overlap with these timelines. With no complications, 12 weeks is achievable; realistic expectation is 16–18 weeks due to public hearing delays or inspection re-scheduling.

Can I start accepting guests before my state license is officially issued?

No. Operating without an Arizona State Lodging License is illegal under A.R.S. § 34-234 and subjects you to civil penalties of $100–$500 per day, plus Cease and Desist Orders from ADHS. You must wait for written confirmation from the Arizona Department of Health Services that your license has been issued before accepting your first guest. Even one day of unlicensed operation exposes you to fines and potential criminal liability. Your state license becomes effective on the date ADHS issues it, not when you apply. Do not accept payment or reservations until you have the license in hand.

Does my Arizona motel license transfer if I move the business to another Glendale location?

No. Your State Lodging License is property-specific and non-transferable. If you relocate to a different building, you must apply for a new State Lodging License for the new location (A.R.S. § 34-226). You will need to go through the full application process again: obtain Glendale zoning approval and Conditional Use Permit for the new site, pass a new ADHS inspection, and pay a new application fee ($400–$650). Your license at the original location automatically becomes invalid once you close operations there. The new location's licensing timeline is 6–10 weeks after local approval. If you wish to operate both locations, you must obtain separate licenses for each property.

What specific fire safety requirements must my motel meet before state inspection?

Glendale Fire Department and Arizona ADHS require motels to have working fire alarm systems in all guest rooms and hallways connected to a monitored central station, emergency exit signs that are illuminated and clearly visible, at least two emergency exits per floor (minimum 8-foot-wide corridors with unobstructed egress), fire extinguishers rated for Class A, B, and C fires placed in hallways and common areas at intervals no greater than 75 feet, automatic sprinkler systems meeting NFPA 13 standards, a fire safety plan posted in guest rooms explaining evacuation procedures and exit routes, emergency lighting in all corridors and stairwells, and clear labeling of emergency contact numbers. Glendale Fire Department (623-930-3000) provides a free pre-inspection consultation to identify deficiencies. Non-compliance at the state inspection will result in failure and mandatory corrections before re-inspection.

What happens if I fail the ADHS state inspection?

If you fail the ADHS inspection, the inspector will provide a written Notice of Non-Compliance detailing all deficiencies (A.R.S. § 34-229). You have up to 30 days to correct violations and request a re-inspection at no additional fee. Common failures include inadequate emergency exits, malfunctioning fire alarms, unsanitary conditions (mold, dirty linens, pest evidence), non-working locks on guest room doors, insufficient lighting, or missing required documentation. You must demonstrate corrective action and obtain written confirmation from the inspector before re-scheduling the inspection. If you fail a second inspection, ADHS may extend the correction deadline to 60 days or deny your license application entirely, requiring you to reapply from the beginning (with new fees). Plan for at least 4–6 weeks between initial inspection failure and successful re-inspection.

Other Business Types in Glendale, AZ

motel Licensing in Other States

See motel licensing in every state →

Sources & References

  • Arizona Revised Statutes § 34-226Establishes requirement for State Lodging License for all lodging facilities
  • Arizona Revised Statutes § 34-229Defines operator qualifications and licensing standards for lodging establishments
  • Arizona Department of Health Services Rules R9-3-217 et seq.Sets health, safety, and sanitation standards for lodging facilities
  • Glendale City Code § 4-2-1 et seq.Establishes local zoning, conditional use permits, and operational requirements for motels
  • Glendale City Code § 4-9-1 et seq.Requires local lodging tax registration and compliance reporting

Licence requirements change. Verify current requirements with the issuing agency before applying.

Editorial standards: This guide is reviewed against primary government sources and cites 5 statutes. Last reviewed September 2026. Scheduled for re-verification by September 2027.

See our editorial policy for how content is created and verified, or report an inaccuracy.